Skip to main content

Dominguez Channel - Phase 2

Go Search
Home
Project Phases
  

Project Phases > Dominguez Channel - Phase 2

 

 

Phase 2

 

Dominguez Channel

 

-       Installed and sampled nine additional groundwater monitoring wells in the access roads along the eastern and western sides of the channel and three wells within Recreation Road

-       Drilled 20 additional shallow soil borings within the channel bed and collected soil and  petroleum compound samples

-       Chemically analyzed soil, groundwater, and petroleum compound samples

Summary of Results:  The results of this phase of work are still pending data analysis.  A report of findings is scheduled to be submitted to the Los Angeles Regional Water Quality Control Board on May 1, 2012.

 
 
Microsoft Windows SharePoint Services Logo

 Site Map

 Click Below for a Full Size Map

  http://www.dominguez.com/shared documents/Phase II Dominguez Channel.pdf